Reports to the Legislature
Close Note: This page consolidates, and makes available electronically, reports to the Legislature from January 1, 2008 to date. These reports come from a variety of sources and the Legislature makes no claim as to the timeliness or comprehensiveness of the list. If you have or are aware of additional reports during this time frame, please send them to the Chief Clerk of the House of Representatives or the Secretary of the Senate.

Reports to the Legislature by the Washington State Institute for Public Policy, the Joint Legislative Audit and Review Committee, and the State Auditor's Office can be accessed at:
WSIPP: https://www.wsipp.wa.gov
JLARC: Audit and Study Reports
SAO: Reports
You may click on the column headings in the table below to sort it in ascending or descending order. For instance, if you would like to see all reports for an organization in date order, first choose the organization from the menu below, then click the Report Date column heading to sort by date. View more information about this page.

Page 70 of 90
Organization Name RCW Bill Exec. Order Report Title Report Date
Transportation, Department of SSB 5165 (2021-22)  (1.3MB) South Pierce Multimodal Connectivity Study Report (21.3MB) 9/1/2023
Transportation, Department of ESSB 6381 (2009-10)  (480k) Southeast King County Commuter Rail Feasibility Report, Appendix A, BNSF Guidance Principles (797k) 8/31/2010
Transportation, Department of ESSB 6381 (2009-10)  (480k) Southeast King County Commuter Rail Feasibility Report, Appendix B, FRA Passenger Rail Safety Manual Table of Contents (29k) 8/31/2010
Transportation, Department of ESSB 6381 (2009-10)  (480k) Southeast King County Commuter Rail Feasibility Report, Appendix C, Stringline Diagrams (1.1MB) 8/31/2010
Transportation, Department of ESSB 6381 (2009-10)  (480k) Southeast King County Commuter Rail Feasibility Report, Appendix E, Track Schematics and Exhibits (2.0MB) 8/31/2010
Transportation, Department of ESSB 6381 (2009-10)  (480k) Southeast King County Commuter Rail Feasibility Report, Appendix G, Southeast King County Connectors Project (94k) 8/31/2010
Transportation, Department of ESSB 6381 (2009-10)  (480k) Southeast King County Commuter Rail Feasibility Report, Executive Summary (1.8MB) 8/31/2010
Transportation, Department of ESSB 6381 (2009-10)  (480k) Southeast King County Commuter Rail, Feasibility Report, Appendix F, Detailed Cost Estimates (233k) 8/31/2010
Student Achievement Council 2ESHB 2376 (2015-16)  (4.3MB) Southeast King County Needs Assessment and Operating Plan (1.2MB) 12/30/2016
Fish and Wildlife, Department of 77.65.620 Southern Resident Killer Whale Vessel Adaptive Management Legislative Report (1.4MB) 11/30/2022
Social & Health Services, Department of ESSB 6002 (2013-14)  (1.2MB) Special Commitment Center Health Care Costs (136k) 11/1/2014
Social & Health Services, Department of ESSB 5187 (2023-24)  (6.2MB) Special Commitment Center Recommendations Regarding Conditional Release Less Restrictive Alternatives (705k) 12/1/2023
Social & Health Services, Department of ESSB 5187 (2023-24)  (6.2MB) Special Commitment Center Report (211k) 12/1/2023
Social & Health Services, Department of ESSB 5092 (2021-22)  (5.1MB) Special Commitment Center Specialized Equipment Report (265k) 11/1/2023
Public Instruction, Office of the Superintendent of EHB 2242 (2017-18)  (1.3MB) Special Education Safety Net Study for 2018 (993k) 11/1/2018
Public Instruction, Office of the Superintendent of 28A.150.392 Special Education Safety Net Survey, 2016-17 (704k) 12/1/2017
Public Instruction, Office of the Superintendent of 28A.150.392 Special Education Safety Net Survey, 2017-18 (906k) 12/1/2018
Public Instruction, Office of the Superintendent of 28A.150.392 Special Education Safety Net Survey, 2019 (401k) 12/1/2019
Public Instruction, Office of the Superintendent of EHB 2242 (2017-18)  (1.3MB) Special Education Safety Net Workgroup: Interim Report (298k) 1/31/2018
Insurance Commissioner, Office of the 48.135.090 Special Investigations Unit, 2010 Report to the Legislature (545k) 6/30/2010
Licensing, Department of 46.18.060 Special License Plate 2013 Annual Report (541k) 1/1/2015
Licensing, Department of 46.18.060 Special License Plate Annual Report, Reporting for 2014 (187k) 1/31/2015
Licensing, Department of 46.18.060 Special License Plate Annual Report, Reporting for 2015 (279k) 1/1/2017
Licensing, Department of 46.18.060 Special License Plate Annual Report, Reporting for 2016 (312k) 12/31/2017
Transportation Committee, Joint SHB 1694 (2007-08)  (49k) Special Needs Transportation Coordination Final Report (1.7MB) 1/1/2009
Financial Management, Office of HB 1736 (2013-14)  (20k) Specified Reporting Requirements for Higher Education Institutes (312k) 8/31/2014
Social & Health Services, Department of ESHB 1109 (2019-20)   Spokane Better Health through Housing - A Pilot Program Connecting Homeless High Emergency Department Utilizers to Housing Report, June 2021 (696k) 6/1/2021
Commerce, Department of 36.100.025 Spokane Public Facilities District - INB Performing Arts Center - Independent Financial Feasibility Review (1.2MB) 10/30/2017
Transportation, Department of 2ESHB 1299 (2015-16)  (1.7MB) SR 16 Tacoma Narrows Bridge, Public-Private Partnership Review (593k) 1/16/2017
Transportation, Department of ESSB 6381 (2009-10)  (480k) SR 161 Traffic Signal Coordination Report (690k) 6/15/2011
Transportation, Department of ESHB 1175 (2011-12)  (653k) SR 167 Corridor Completion Comprehensive Tolling Study, Final Report (6.6MB) 2/11/2013
Transportation, Department of 47.56.403 SR 167 HOT Lanes Pilot Project (1.1MB) 7/30/2009
Transportation, Department of 47.56.403 SR 167 HOT Lanes Pilot Project, Fourth Annual Performance Summary, May 2008 - April 2012 (2.1MB) 10/16/2012
Transportation, Department of ESSB 5825 (2019-20)  (147k) SR 167 Master Plan - Planning and Environmental Linkages Study (4.8MB) 6/1/2023
Transportation, Department of ESHB 2524 (2015-16)  (1.3MB) SR 169 Safety Study: Maple Valley to Renton (10.0MB) 12/1/2016
Transportation, Department of ESHB 1160 (2019-20)  (1.2MB) SR 518 - SR 509 to I-5 -- Corridor Planning Study (4.8MB) 5/1/2020
Transportation, Department of SSB 5165 (2021-22)   SR 520 Bridge Self-Insurance Evaluation (165k) 12/1/2021
Transportation, Department of ESHB 2211 (2009-10)  (34k) SR 520 Legislative Workgroup Recommendations (2.8MB) 12/31/2009
Transportation, Department of ESSB 5352 (2009-10)  (339k) SR 520 Real-time Ridesharing Pilot Project (4.9MB) 6/30/2011
Transportation, Department of ESSB 5352 (2009-10)  (339k) SR 520 Real-time Ridesharing Pilot Project Case Study (1.5MB) 6/30/2011
Transportation, Department of ESSB 5689 (2021-22)  (1009k) SR302 Victor Area Corridor Study; MP0 to MP7.7 (27.1MB) 6/1/2023
Community & Technical Colleges, State Board for (SBCTC) 2SHB 2513 (2019-20)   SSHB 2513 - Transcript Withholding and Limiting the Practice of Registration Holds as Debt Collection Practices (449k) 12/1/2021
Commerce, Department of ESSB 5187 (2023-24)  (6.2MB) Stabilizing Rents for Tenants in State-Funded Affordable Housing Interim Report (620k) 12/1/2023
Corrections, Department of ESB 5907 (2011-12)  (21k) Staff Safety, 2011 Report (471k) 11/1/2011
Corrections, Department of ESB 5907 (2011-12)  (21k) Staff Safety, 2011 Report Appendix (12.1MB) 11/1/2011
Corrections, Department of 72.09.680 Staff Safety, 2012 Report (519k) 11/1/2012
Corrections, Department of 72.09.680 Staff Safety, 2015 Report (2.2MB) 12/1/2015
Corrections, Department of 72.09.680 Staff Safety, 2016 Report (2.7MB) 11/30/2016
Corrections, Department of 72.09.680 Staff Safety, 2017 Report (5.1MB) 12/1/2017
Corrections, Department of 72.09.680 Staff Safety, 2018 Report (2.6MB) 12/1/2018

Page 70 of 90