The Legislature website will be unavailable intermittently this Saturday, June 13th from 7AM to 7PM during scheduled server maintenance. We apologize for the inconvenience.
For the purpose of the Washington state public works law, chapter 39.12 RCW, outside telephone line construction includes, but is not limited to, the following work:
(1) Head groundman. Operates light equipment and drives vehicles.
(2) Telephone equipment operator - light. Operates backhoes, trenching machines and small cable plows.
(3) Telephone equipment operator - heavy. Operates bulldozers, trenchers, backhoes, cable plows and plows pulling other equipment.
Note: | This scope of work description does not apply to the compaction and resurfacing of trenches or ditches associated with asphalt and other road repair and replacement. |