Value engineering study requirements.
The executive director may determine whether a value engineering study is required based on project risk factors summarized below. The agency will be notified if a value engineering study is required during the design process and must complete the study prior to authorization to bid.
(1) Significant project complexity;
(2) Significant structures;
(3) Significant right of way;
(4) Multiple alignment options;
(5) Environmentally sensitive areas;
(6) Complex interagency involvement.
The value engineering study is completed when the local agency submits the recommendation report to TIB. TIB may consider what recommendations are accepted or rejected when evaluating any funding increase or scope change request.
[Statutory Authority: Chapter
47.26 RCW. WSR 23-08-032, § 479-05-040, filed 3/28/23, effective 4/28/23; WSR 12-08-060, § 479-05-040, filed 4/3/12, effective 5/4/12. Statutory Authority: Chapters
47.26 and
47.66 RCW. WSR 08-10-012, § 479-05-040, filed 4/24/08, effective 5/25/08. Statutory Authority: Chapter
47.26 RCW. WSR 07-18-050, § 479-05-040, filed 8/30/07, effective 9/30/07. Statutory Authority: Chapters
47.26 and
47.66 RCW. WSR 99-24-038, § 479-05-040, filed 11/23/99, effective 12/24/99.]