PDFWAC 508-12-030
Regulation of water right diversions—Controlling works—Measuring devices.
Where controlling works or measuring devices are not installed or maintained to the satisfaction of the department of ecology, proper notice shall be given to the owner to install or repair such controlling works or measuring device. This notice shall allow not less than ten days time to make necessary repairs or installations. In the event the work outlined in the notice is not completed in the specified time, the diversion shall be closed to further flow of water, until such time as the notice has been fully complied with.
[Statutory Authority: Chapter 43.27A RCW. WSR 88-13-037 (Order 88-11), § 508-12-030, filed 6/9/88; Rule 3, filed 3/23/60. Formerly WAC 134-12-030.]