The Legislature website will be unavailable intermittently this Saturday, June 13th from 7AM to 7PM during scheduled server maintenance. We apologize for the inconvenience.

Title 332 WAC

NATURAL RESOURCES, BOARD AND DEPARTMENT OF

Hide dispositions

Last update: 2/25/25

HTML versions have links
PDF versions have authentication

Title digest PDF

Including dispositions

Chapters
332-08Practice and procedure.
332-10Public records—Department of natural resources and board of natural resources.
332-12Oil and gas leases.
332-14Coal leasing rules and regulations.
332-16Mineral prospecting leases and mining contracts.
332-17Geothermal drilling rules and regulations.
332-18Surface mine reclamation.
332-20Grazing lands.
332-21State urban lands.
332-22State land leasing program rules.
332-24Forest protection.
332-26Emergency and short term rules.
332-28Harbor line commission.
332-30Aquatic land management.
332-32Insect and worm control.
332-36Road rules on state-owned lands.
332-41SEPA policies and procedures.
332-52Public access and recreation.
332-60Natural areas—Natural area preserves.
332-100Leases, sales, rights of way, etc.
332-110Leases of state-owned land.
332-120Survey monuments—Removal or destruction.
332-130Minimum standards for land boundary surveys and geodetic control surveys and guidelines for the preparation of land descriptions.
332-140Forest Products Industry Recovery Act of 1982.
332-150Survey, plat and map filing and recording fees.
332-160Committee on geographic names and geographic names policies and procedures.

Disposition of chapters formerly codified in this title

Chapter 332-40
GUIDELINES INTERPRETING AND IMPLEMENTING THE STATE ENVIRONMENTAL POLICY ACT
332-40-010Authority. [Order 259, § 332-40-010, filed 6/10/76; Order 257, § 332-40-010, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150. Later promulgation, see WAC 332-41-010.
332-40-020Purpose. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-020, filed 4/11/78; Order 259, § 332-40-020, filed 6/10/76; Order 257, § 332-40-020, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150. Later promulgation, see WAC 332-41-030.
332-40-025Scope and coverage of this chapter. [Order 259, § 332-40-025, filed 6/10/76; Order 257, § 332-40-025, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-030Integration of SEPA procedures with other department operations. [Order 259, § 332-40-030, filed 6/10/76; Order 257, § 332-40-030, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-035Statute of limitations. [Order 259, § 332-40-035, filed 6/10/76; Order 257, § 332-40-035, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-037SEPA public information center. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-037, filed 4/11/78; Order 259, § 332-40-037, filed 6/10/76; Order 257, § 332-40-037, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-040Definitions. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-040, filed 4/11/78; Order 259, § 332-40-040, filed 6/10/76; Order 257, § 332-40-040, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150. Later promulgation, see WAC 332-41-040.
332-40-045Responsible official. [Order 259, § 332-40-045, filed 6/10/76; Order 257, § 332-40-045, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-050Use of the environmental checklist form. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-050, filed 4/11/78; Order 259, § 332-40-050, filed 6/10/76; Order 257, § 332-40-050, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-055Timing of the EIS process. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-055, filed 4/11/78; Order 259, § 332-40-055, filed 6/10/76; Order 257, § 332-40-055, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150. Later promulgation, see WAC 332-41-055.
332-40-060Scope of a proposal and its impacts for the purposes of lead agency determination, threshold determination, and EIS preparation. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-060, filed 4/11/78; Order 259, § 332-40-060, filed 6/10/76; Order 257, § 332-40-060, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-100Summary of information which may be required of a private applicant. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-100, filed 4/11/78; Order 259, § 332-40-100, filed 6/10/76; Order 257, § 332-40-100, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-160No presumption of significance for nonexempt actions. [Order 259, § 332-40-160, filed 6/10/76; Order 257, § 332-40-160, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-170Categorical exemptions. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-170, filed 4/11/78; Order 259, § 332-40-170, filed 6/10/76; Order 257, § 332-40-170, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-175Exemptions and nonexemptions applicable to specific state agencies. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-175, filed 4/11/78; Order 268, § 332-40-175, filed 7/21/76; Order 259, § 332-40-175, filed 6/10/76; Order 257, § 332-40-175, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-177Environmentally sensitive areas. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-177, filed 4/11/78; Order 259, § 332-40-177, filed 6/10/76; Order 257, § 332-40-177, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-180Exemption for emergency actions. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-180, filed 4/11/78; Order 259, § 332-40-180, filed 6/10/76; Order 257, § 332-40-180, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-190Use and effect of categorical exemptions. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-190, filed 4/11/78; Order 259, § 332-40-190, filed 6/10/76; Order 257, § 332-40-190, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-200Lead agencyResponsibilities. [Order 259, § 332-40-200, filed 6/10/76; Order 257, § 332-40-200, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-203Determination of lead agencyProcedures. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-203, filed 4/11/78; Order 259, § 332-40-203, filed 6/10/76; Order 257, § 332-40-203, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-205Lead agency designationDepartment proposals. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-205, filed 4/11/78; Order 259, § 332-40-205, filed 6/10/76; Order 257, § 332-40-205, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-210Lead agency designationProposals involving both private and public construction activity. [Order 259, § 332-40-210, filed 6/10/76; Order 257, § 332-40-210, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-215Lead agency designationPrivate projects for which the department is the only agency with jurisdiction. [Order 259, § 332-40-215, filed 6/10/76; Order 257, § 332-40-215, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-220Lead agency designationPrivate projects requiring licenses from more than one agency, when one of the agencies is a county/city. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-220, filed 4/11/78; Order 259, § 332-40-220, filed 6/10/76; Order 257, § 332-40-220, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-225Lead agency designationPrivate projects requiring licenses from more than one state agency. [Order 259, § 332-40-225, filed 6/10/76; Order 257, § 332-40-225, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-230Lead agency designationSpecific proposals. [Order 259, § 332-40-230, filed 6/10/76; Order 257, § 332-40-230, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-240Agreements as to lead agency status. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-240, filed 4/11/78; Order 259, § 332-40-240, filed 6/10/76; Order 257, § 332-40-240, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-245Agreements between agencies as to division of lead agency duties. [Order 259, § 332-40-245, filed 6/10/76; Order 257, § 332-40-245, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-260Dispute as to lead agency determinationResolution by CEP. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-260, filed 4/11/78; Order 259, § 332-40-260, filed 6/10/76; Order 257, § 332-40-260, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-300Threshold determination requirement. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-300, filed 4/11/78; Order 259, § 332-40-300, filed 6/10/76; Order 257, § 332-40-300, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-305Designation of responsible official. [Order 259, § 332-40-305, filed 6/10/76; Order 257, § 332-40-305, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-310Threshold determination proceduresEnvironmental checklist. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-310, filed 4/11/78; Order 259, § 332-40-310, filed 6/10/76; Order 257, § 332-40-310, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-315Actions requiring a threshold determination. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-315, filed 4/11/78; Order 259, § 332-40-315, filed 6/10/76; Order 257, § 332-40-315, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150. Later promulgation, see WAC 332-41-310.
332-40-320Threshold determination proceduresInitial review of environmental checklist. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-320, filed 4/11/78; Order 259, § 332-40-320, filed 6/10/76; Order 257, § 332-40-320, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-330Threshold determination proceduresInformation in addition to checklist. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-330, filed 4/11/78; Order 259, § 332-40-330, filed 6/10/76; Order 257, § 332-40-330, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-340Threshold determination proceduresNegative declarations. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-340, filed 4/11/78; Order 259, § 332-40-340, filed 6/10/76; Order 257, § 332-40-340, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-345Assumption of lead agency status by the department when it is an agency with jurisdiction over a proposalPrerequisites, effect and form of notice. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-345, filed 4/11/78; Order 259, § 332-40-345, filed 6/10/76; Order 257, § 332-40-345, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-350Affirmative threshold determination. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-350, filed 4/11/78; Order 259, § 332-40-350, filed 6/10/76; Order 257, § 332-40-350, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-355Form of declaration of significance/nonsignificance. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-355, filed 4/11/78; Order 259, § 332-40-355, filed 6/10/76; Order 257, § 332-40-355, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-360Threshold determination criteriaApplication of environmental checklist. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-360, filed 4/11/78; Order 259, § 332-40-360, filed 6/10/76; Order 257, § 332-40-360, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-365Environmental checklist. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-365, filed 4/11/78; Order 259, § 332-40-365, filed 6/10/76; Order 257, § 332-40-365, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-370Withdrawal of affirmative threshold determination. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-370, filed 4/11/78; Order 259, § 332-40-370, filed 6/10/76; Order 257, § 332-40-370, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-375Withdrawal of negative threshold determination. [Order 259, § 332-40-375, filed 6/10/76; Order 257, § 332-40-375, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-400Duty to begin preparation of a draft EIS. [Order 259, § 332-40-400, filed 6/10/76; Order 257, § 332-40-400, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-405Purpose and function of a draft EIS. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-405, filed 4/11/78; Order 259, § 332-40-405, filed 6/10/76; Order 257, § 332-40-405, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-410Predraft consultation procedures. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-410, filed 4/11/78; Order 259, § 332-40-410, filed 6/10/76; Order 257, § 332-40-410, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-420Preparation of EIS by persons outside the department. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-420, filed 4/11/78; Order 259, § 332-40-420, filed 6/10/76; Order 257, § 332-40-420, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150. Later promulgation, see WAC 332-41-420.
332-40-425Organization and style of a draft EIS. [Order 259, § 332-40-425, filed 6/10/76; Order 257, § 332-40-425, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-440Contents of a draft EIS. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-440, filed 4/11/78; Order 259, § 332-40-440, filed 6/10/76; Order 257, § 332-40-440, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-442Special considerations regarding contents of an EIS on a nonproject action. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-442, filed 4/11/78; Order 259, § 332-40-442, filed 6/10/76; Order 257, § 332-40-442, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-444List of elements of the environment. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-444, filed 4/11/78; Order 259, § 332-40-444, filed 6/10/76; Order 257, § 332-40-444, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-446Draft EISOptional additional elementsLimitation. [Order 259, § 332-40-446, filed 6/10/76; Order 257, § 332-40-446, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-450Public awareness of availability of draft EIS. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-450, filed 4/11/78; Order 259, § 332-40-450, filed 6/10/76; Order 257, § 332-40-450, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-455Circulation of the draft EISReview period. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-455, filed 4/11/78.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-460Specific agencies to which draft EIS shall be sent. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-460, filed 4/11/78; Order 259, § 332-40-460, filed 6/10/76; Order 257, § 332-40-460, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-465Agencies possessing environmental expertise. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-465, filed 4/11/78; Order 259, § 332-40-465, filed 6/10/76; Order 257, § 332-40-465, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-470Cost to the public for reproduction of environmental documents. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-470, filed 4/11/78; Order 259, § 332-40-470, filed 6/10/76; Order 257, § 332-40-470, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-480Public hearing on a proposalWhen required. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-480, filed 4/11/78; Order 259, § 332-40-480, filed 6/10/76; Order 257, § 332-40-480, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-485Notice of public hearing on environmental impact of the proposal. [Order 259, § 332-40-485, filed 6/10/76; Order 257, § 332-40-485, filed 5/21/76.] Repealed by 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-490Public hearing on the proposalUse of environmental documents. [Order 259, § 332-40-490, filed 6/10/76; Order 257, § 332-40-490, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-495Preparation of amended or new draft EIS. [Order 259, § 332-40-495, filed 6/10/76; Order 257, § 332-40-495, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-500Department responsibilities when consulted as an agency with jurisdiction. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-500, filed 4/11/78; Order 259, § 332-40-500, filed 6/10/76; Order 257, § 332-40-500, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-520Department responsibilities when consulted as an agency with environmental expertise. [Order 259, § 332-40-520, filed 6/10/76; Order 257, § 332-40-520, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-530Responsibilities of the departmentWhen predraft consultation has occurred. [Order 259, § 332-40-530, filed 6/10/76; Order 257, § 332-40-530, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-535Cost of performance of consulted agency responsibilities. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-535, filed 4/11/78; Order 259, § 332-40-535, filed 6/10/76; Order 257, § 332-40-535, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-540Limitations on responses to consultation. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-540, filed 4/11/78; Order 259, § 332-40-540, filed 6/10/76; Order 257, § 332-40-540, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-545Effect of no written comment. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-545, filed 4/11/78; Order 259, § 332-40-545, filed 6/10/76; Order 257, § 332-40-545, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-570Preparation of the final EISContentsWhen no critical comments received on the draft EIS. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-570, filed 4/11/78; Order 259, § 332-40-570, filed 6/10/76; Order 257, § 332-40-570, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-580Preparation of the final EISContentsWhen critical comments received on the draft EIS. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-580, filed 4/11/78; Order 259, § 332-40-580, filed 6/10/76; Order 257, § 332-40-580, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-600Circulation of the final EIS. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-600, filed 4/11/78; Order 259, § 332-40-600, filed 6/10/76; Order 257, § 332-40-600, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-650Effect of an adequate final EIS prepared pursuant to NEPA. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-650, filed 4/11/78; Order 259, § 332-40-650, filed 6/10/76; Order 257, § 332-40-650, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-652Supplementation by the department of an inadequate final NEPA EIS. [Order 259, § 332-40-652, filed 6/10/76; Order 257, § 332-40-652, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-660Use of previously prepared EIS for a different proposed action. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-660, filed 4/11/78; Order 259, § 332-40-660, filed 6/10/76; Order 257, § 332-40-660, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-690Use of another lead agency's EIS by the department for the same proposal. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-690, filed 4/11/78; Order 259, § 332-40-690, filed 6/10/76; Order 257, § 332-40-690, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-695Draft and final supplements to a revised EIS. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-695, filed 4/11/78; Order 259, § 332-40-695, filed 6/10/76; Order 257, § 332-40-695, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-700EIS combined with existing planning and review processes. [Order 259, § 332-40-700, filed 6/10/76; Order 257, § 332-40-700, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-710No action for seven days after publication of the final EIS. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-710, filed 4/11/78.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-800Amendments to this chapter. [Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810. WSR 78-05-015 (Order 292), § 332-40-800, filed 4/11/78; Order 259, § 332-40-800, filed 6/10/76; Order 257, § 332-40-800, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-830SEPA public information center. [Order 259, § 332-40-830, filed 6/10/76; Order 257, § 332-40-830, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-835Regional SEPA public information centers. [Order 259, § 332-40-835, filed 6/10/76; Order 257, § 332-40-835, filed 5/21/76.] Repealed by WSR 78-05-015 (Order 292), filed 4/11/78. Statutory Authority: RCW 43.21C.120, WAC 197-10-800 and 197-10-810.
332-40-840Application of agency guidelines to ongoing actions. [Order 259, § 332-40-840, filed 6/10/76; Order 257, § 332-40-840, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
332-40-910Severability. [Order 259, § 332-40-910, filed 6/10/76; Order 257, § 332-40-910, filed 5/21/76.] Repealed by WSR 84-18-052 (Order 432), filed 9/5/84. Statutory Authority: Chapter 43.21C RCW and RCW 43.30.150.
Chapter 332-44
STRAY LOGS
332-44-010Stray logsPossession marks. [Resolution No. 1, filed 1/27/65.] Repealed by WSR 05-01-116, filed 12/15/04, effective 1/15/05. Statutory Authority: Chapter 76.40 RCW (repealed).
332-44-020Log patrolActivity in Everett harbor. [Docket 255, § 1, filed 10/28/66.] Repealed by WSR 05-01-116, filed 12/15/04, effective 1/15/05. Statutory Authority: Chapter 76.40 RCW (repealed).
332-44-030Closed portion of Everett harbor. [Docket 255, § 2, filed 10/28/66.] Repealed by WSR 05-01-116, filed 12/15/04, effective 1/15/05. Statutory Authority: Chapter 76.40 RCW (repealed).
332-44-040Closed portion of Everett harborException. [Docket 255, § 3, filed 10/28/66.] Repealed by WSR 05-01-116, filed 12/15/04, effective 1/15/05. Statutory Authority: Chapter 76.40 RCW (repealed).
332-44-050Closed portion of Everett harborLicensed log patrolmenDuties. [Docket 255, § 4, filed 10/28/66.] Repealed by WSR 05-01-116, filed 12/15/04, effective 1/15/05. Statutory Authority: Chapter 76.40 RCW (repealed).
332-44-060Closed portion of Everett harborOpening closed areaNotice. [Docket 255, § 5, filed 10/28/66.] Repealed by WSR 05-01-116, filed 12/15/04, effective 1/15/05. Statutory Authority: Chapter 76.40 RCW (repealed).
332-44-070Closed portion of Everett harborViolationsPenalty. [Docket 255, § 6, filed 10/28/66.] Repealed by WSR 05-01-116, filed 12/15/04, effective 1/15/05. Statutory Authority: Chapter 76.40 RCW (repealed).
332-44-080Closed portion of Everett harborSupersession of prior agreements. [Docket 255, § 7, filed 10/28/66.] Repealed by WSR 05-01-116, filed 12/15/04, effective 1/15/05. Statutory Authority: Chapter 76.40 RCW (repealed).
332-44-090Severability. [Docket 255, § 8, filed 10/28/66.] Repealed by WSR 05-01-116, filed 12/15/04, effective 1/15/05. Statutory Authority: Chapter 76.40 RCW (repealed).
Chapter 332-48
FIRE AND GAME DAMAGE
332-48-010Electrical fence controllers. [Resolution No. 54, filed 6/3/64.] Repealed by WSR 91-20-060 (Order 583), filed 9/24/91, effective 10/16/91. Statutory Authority: RCW 76.04.015.
332-48-020Unauthorized use of Colockum airstrip. [Resolution No. 44, filed 11/5/63.] Repealed by WSR 91-20-060 (Order 583), filed 9/24/91, effective 10/16/91. Statutory Authority: RCW 76.04.015.
332-48-050Fire rules. [Resolution 21, filed 6/6/61.] Repealed by Order 256, filed 5/13/76. Later promulgation, see WAC 332-24-061.