Padilla Bay planning standard.

Those covered vessel and facility plan holders that transit or operate north of State Highway 20, east of a line drawn from Shannon Point on Fidalgo Island to Kelly's Point on Guemes Island, south of a line drawn from Clark Point on Guemes Island and William Point on Samish Island must meet the following standards. Some of the GRPs may be deployed by land.
Time (hours)
Boom/Assessment
Minimum Oil Recovery Rate
% of WCS volume per 24 hours
Minimum Storage in Barrels
1.5
A safety assessment of the spill by trained crew and appropriate air monitoring, with 1,000 feet of boom could have arrived
 
 
2
Additional 2,000 feet of boom, or 4 times the length of the largest vessel whichever is less, to be used for containment, protection or recovery could have arrived
 
 
6
Additional 10,000 feet of appropriate types of boom for containment, protection or recovery could have arrived
Capacity to recover the lesser of 3% of worst case spill volume or 12,500 barrels within 24-hour period could have arrived. 50% must be able to work in shallow water environments. Depth of 10 feet or less
1 times the EDRC
12
Additional 20,000 feet of appropriate types of boom for containment, protection or recovery could have arrived
Capacity to recover the lesser of 10% of worst case spill volume or 36,000 barrels within 24-hour period could have arrived on scene. At least 20% of the skimming capability must be able to work in shallow water environments. Depth of 10 feet or less
1.5 times the EDRC
24
Additional 20,000 feet of boom for containment, protection or recovery could have arrived
Capacity to recover the lesser of 14% of worst case spill volume or 48,000 barrels within 24-hour period could have arrived
2 times the EDRC
48
More boom necessary for containment, recovery or protection
Capacity to recover the lesser of 25% of worst case spill volume or 60,000 barrels within 24-hour period could have arrived
More as necessary to not slow the response
[Statutory Authority: RCW 88.46.0601, 88.46.060, 88.46.120, 88.46.068, 90.56.2101, 90.56.210, 90.56.240, 90.56.569, 90.56.050, and 90.56.005. WSR 20-01-165 (Order 18-10), § 173-182-375, filed 12/18/19, effective 1/18/20. Statutory Authority: Chapters 88.46, 90.48, 90.56 RCW, and 2011 c 122. WSR 13-01-054 (Order 11-06), § 173-182-375, filed 12/14/12, effective 1/14/13. Statutory Authority: Chapters 88.46, 90.56, and 90.48 RCW. WSR 06-20-035 (Order 00-03), § 173-182-375, filed 9/25/06, effective 10/26/06.]