PDFWAC 296-155-17339
Startup dates.
Compliance with all obligations of this standard commence March 3, 1993, except as follows:
(1) Initial monitoring under WAC 296-155-17311(2) must be completed as soon as possible but no later than June 3, 1993.
(2) Medical examinations under WAC 296-155-17327, must be completed as soon as possible but no later than August 14, 1993.
(3) Emergency plans required by WAC 296-155-17309 must be provided and available for inspection and copying as soon as possible but no later than July 13, 1993.
(4) Initial training and education must be completed as soon as possible but no later than July 13, 1993.
(5) Decontamination and lunch areas under WAC 296-155-17321 must be in operation as soon as possible but no later than March 3, 1993.
(6) Respiratory protection required by WAC 296-155-17317 must be provided as soon as possible but no later than July 13, 1993.
(7) Written compliance plans required by WAC 296-155-17315(5) must be completed and available for inspection and copying as soon as possible but no later than July 13, 1993.
(8) DOSH must enforce the permissible exposure limits in WAC 296-155-17305 no earlier than July 13, 1993.
(9) Engineering controls needed to achieve the PELs must be in place March 3, 1993.
(10) Personal protective clothing required by WAC 296-155-17317 must be available July 13, 1993.