HTML has links - PDF has Authentication

Chapter 296-150T WAC

Last Update: 10/22/24

FACTORY-BUILT TEMPORARY WORKER HOUSING STRUCTURES

WAC Sections

HTMLPDF296-150T-0010Authority, purpose, and scope.
HTMLPDF296-150T-0020What definitions apply to this chapter?
HTMLPDF296-150T-0030How is this chapter enforced?
HTMLPDF296-150T-0040Will you keep my manufacturing information confidential?
HTMLPDF296-150T-0050Can you prohibit the installation of factory-built temporary worker housing structures?
HTMLPDF296-150T-0070Do you have reciprocal agreements with other states to inspect factory-built temporary worker housing structures?
HTMLPDF296-150T-0080Do you allow a local enforcement agency to inspect factory-built temporary worker housing at the manufacturing location?
HTMLPDF296-150T-0100What happens if I disagree with your decision regarding my compliance with this chapter?
HTMLPDF296-150T-0110Do you have an advisory board to address factory-built temporary worker housing structure issues?
HTMLPDF296-150T-0120Where can I obtain technical assistance regarding factory-built temporary worker housing structures?
HTMLPDF296-150T-0130How do I register a complaint?
HTMLPDF296-150T-0140Do you allow the use of alternate materials, alternate design and method of construction?
INSIGNIA
HTMLPDF296-150T-0200Who must purchase factory-built temporary worker housing insignia?
HTMLPDF296-150T-0210What are the insignia requirements?
HTMLPDF296-150T-0220How do I obtain insignia information and the required forms?
HTMLPDF296-150T-0230What are the insignia application requirements?
HTMLPDF296-150T-0250How do I replace lost or damaged insignia?
DESIGN PLAN
HTMLPDF296-150T-0300When is design plan approval required?
DESIGN-PLAN APPROVAL
HTMLPDF296-150T-0320What must I provide with my request for design-plan approval by the department?
HTMLPDF296-150T-0340What must an engineering analysis for design plans include?
HTMLPDF296-150T-0350What must the test procedures and results for design plans include?
HTMLPDF296-150T-0380What happens if you approve my design plan?
HTMLPDF296-150T-0390If my design plan is not approved, how much time do I have to submit a corrected design plan?
HTMLPDF296-150T-0400What happens after my design plan is approved?
HTMLPDF296-150T-0410When does my design plan expire?
HTMLPDF296-150T-0495Contractor deposit accounts.
INSPECTIONS PRIOR TO ISSUANCE OF AN INSIGNIA
HTMLPDF296-150T-0500When is an inspection required?
HTMLPDF296-150T-0510How do I request an inspection?
HTMLPDF296-150T-0520What happens if my factory-built temporary worker housing structure passes inspection?
HTMLPDF296-150T-0530Am I charged if I request an inspection but I am not prepared?
HTMLPDF296-150T-0540Who inspects factory-built temporary worker housing structures for installation at the temporary worker housing site?
HTMLPDF296-150T-0550Do you notify the department of health after your final inspection of factory-built structures at a manufacturing location?
USED FACTORY-BUILT STRUCTURES WITHOUT AN INSIGNIA
HTMLPDF296-150T-0580Must I obtain an insignia for used factory-built structures?
HTMLPDF296-150T-0590How do I obtain insignia for used factory-built structures?
CODES FOR FACTORY-BUILT TEMPORARY WORKER HOUSING
HTMLPDF296-150T-0600What manufacturing codes apply to factory-built temporary worker housing?
MANUFACTURER'S NOTICE TO THE DEPARTMENT
HTMLPDF296-150T-0700Must manufacturers of factory-built temporary worker housing structures notify you if they manufacture at more than one location?
HTMLPDF296-150T-0710Must manufacturers of factory-built temporary worker housing structures notify you of a change in business name or address?
HTMLPDF296-150T-0720Must manufacturers of factory-built temporary worker housing structures notify you of a change in business ownership?
FACTORY-BUILT TEMPORARY WORKER HOUSING FEES
HTMLPDF296-150T-3000Factory-built temporary worker housing fees.