(Effective until January 1, 2025)
PDFWAC 296-150M-3000
Manufactured/mobile home fees.
DESIGN PLAN FEES: | |||
STRUCTURAL ALTERATION | $216.00 | ||
RESUBMITTAL FEE | $95.30 | ||
ADDENDUM (Approval expires on the same date as original plan.) | $95.30 | ||
ELECTRONIC PLAN SUBMITTAL FEE $6.50 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section. | |||
DEPARTMENT INSPECTION FEES: | |||
Combination permit - Mechanical and electrical inspections | $236.10 | ||
Heat pump | $236.10 | ||
Air conditioning | $236.10 | ||
Air conditioning with replacement furnace | $236.10 | ||
Gas furnace installation includes gas piping | $236.10 | ||
Fire safety inspection | $236.10 | ||
MECHANICAL | |||
Gas*** piping | $104.80 | ||
Wood stove | $104.80 | ||
Pellet stove | $104.80 | ||
Gas*** Room heater | $104.80 | ||
Gas*** Decorative appliance | $104.80 | ||
Range: Changing from electric to gas*** | $104.80 | ||
Gas*** Water heater replacement | $78.40 | ||
ELECTRICAL | |||
Electric water heater replacement | $131.20 | ||
Electric water heater replacing gas*** water heater | $131.20 | ||
Each added or modified 120 volt circuit (maximum charge is two circuits) | $131.20 | ||
Each added 240 volt circuit (for other than heat pumps, air conditioners, furnaces, water heaters, ranges, hot tubs or spas) | $131.20 | ||
Hot tub or spa (power from home electrical panel) | $131.20 | ||
Replace main electrical panel/permanently installed transfer equipment | $131.20 | ||
Low voltage fire/intrusion alarm | $131.20 | ||
Any combination of furnace, range and water heater changing from electric to gas*** | $131.20 | ||
PLUMBING | |||
Fire sprinkler system | $294.90 | ||
Each added fixture | $78.40 | ||
Replacement of water piping system (this includes two inspections) | $263.30 | ||
STRUCTURAL | |||
Inspection as part of a mechanical/fire safety installation (cut truss/floor joist, sheet rocking) | $117.60 | ||
Reroofs (may require a plan review) | $210.30 | ||
Changes to home when additions bear loads on home per the design of a professional (also requires a plan review) | $210.30 | ||
Other structural changes (may require a plan review) | $210.30 | ||
MISCELLANEOUS | |||
OTHER REQUIRED INSPECTIONS (per hour*) | $86.00 | ||
ALL REINSPECTIONS (per hour*) | $86.00 | ||
Manufactured home installation inspection permit (only available in cities and counties with L&I inspection contract) | $602.90 | ||
Refund | $25.90 | ||
INSIGNIA FEES: | |||
REISSUED - LOST/DAMAGED | $25.90 | ||
IPIA | |||
DEPARTMENT AUDIT FEES | |||
REGULARLY SCHEDULED IPIA AUDIT: | |||
First inspection on each section (one time only) | $43.10 | ||
Second and succeeding inspections of unlabeled sections (per hour*) | $95.30 | ||
OTHER IPIA FEES: | |||
Red tag removal during a regularly scheduled IPIA audit (per hour* separate from other fees) | $95.30 | ||
Red tag removal at a time other than a regularly scheduled IPIA audit (per hour* plus travel time* and mileage**) | $95.30 | ||
Increased frequency surveillance (per hour* plus travel time* and mileage**) | $95.30 | ||
Attendance at manufacturers training classes (per hour* only) | $95.30 | ||
Subpart "I" investigations (per hour* plus travel time* and mileage**) | $95.30 | ||
Alterations to a labeled unit (per hour* plus travel time* and mileage**) | $95.30 | ||
IPIA Issues/Responses (per hour* plus travel time* and mileage**) | $95.30 | ||
Monthly surveillance during a regularly scheduled IPIA audit (per hour* plus travel time* and mileage**) | $95.30 | ||
Monthly surveillance at a time other than a regularly scheduled IPIA audit (per hour* plus travel time* and mileage**) | $95.30 | ||
Plant certifications, recertifications and addenda updates (per hour* plus travel time* and mileage** per each inspector) | $95.30 | ||
Response to HBT audit during a regularly scheduled IPIA audit (per hour*) | $95.30 | ||
Response to HBT audit at a time other than a regularly scheduled IPIA audit (per hour* plus travel time* and mileage**) | $95.30 | ||
Alternative construction (AC) letter inspections at placement site (per hour* plus travel time* and mileage**) | $95.30 | ||
Replacement of HUD labels (per hour* plus travel time* and mileage**) | $95.30 | ||
State administrative agency (SAA) inspection fee (per hour* plus travel time* and mileage**) | $95.30 | ||
State administrative agency (SAA) dispute resolution filing fee | $95.30 | ||
State administrative agency (SAA) dispute resolution (per hour*) | $95.30 | ||
OTHER FEES: | |||
FIELD TECHNICAL SERVICE (per hour plus travel time* and mileage**) | $88.60 | ||
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (one free copy per year upon request) | $17.30 | ||
VARIANCE INSPECTION FEE | $210.30 | ||
HOMEOWNER REQUESTED INSPECTION | $210.30 | ||
DECERTIFICATION OF A MOBILE/MANUFACTURED HOME | $210.30 | ||
DEMOLITION OF A MOBILE/MANUFACTURED HOME | $210.30 | ||
ENERGY CONSERVATION PERMIT | $35.60 |
NOTE: | Local jurisdictions may have other fees that apply. |
* | Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments. |
** | Per state guidelines. |
*** | Gas means all gases; natural, propane, etc. |
[Statutory Authority: Chapters 43.22 and 43.22A RCW. WSR 23-21-084, § 296-150M-3000, filed 10/17/23, effective 12/1/23; WSR 22-19-074, § 296-150M-3000, filed 9/20/22, effective 11/1/22; WSR 22-01-193, § 296-150M-3000, filed 12/21/21, effective 1/31/22; WSR 21-07-126, § 296-150M-3000, filed 3/23/21, effective 4/23/21; WSR 20-04-081, § 296-150M-3000, filed 2/4/20, effective 3/6/20. Statutory Authority: Chapters 18.27, 70.87, 43.22, and 43.22A RCW. WSR 18-24-102, § 296-150M-3000, filed 12/4/18, effective 1/4/19. Statutory Authority: Chapter 43.22 RCW and 2011 1st sp.s. c 50. WSR 12-06-069, § 296-150M-3000, filed 3/6/12, effective 4/30/12. Statutory Authority: Chapters 18.106, 43.22 RCW, 2008 c 285 and c 329. WSR 08-12-042, § 296-150M-3000, filed 5/30/08, effective 6/30/08. Statutory Authority: Chapters 18.27, 18.106, 43.22, and 70.87 RCW. WSR 07-11-128, § 296-150M-3000, filed 5/22/07, effective 6/30/07. Statutory Authority: Chapter 43.22 RCW. WSR 07-05-063, § 296-150M-3000, filed 2/20/07, effective 4/1/07. Statutory Authority: Chapters 18.106, 43.22, and 70.87 RCW. WSR 06-10-066, § 296-150M-3000, filed 5/2/06, effective 6/30/06. Statutory Authority: Chapter 43.22 RCW and 2005 c 399. WSR 05-24-020, § 296-150M-3000, filed 11/29/05, effective 1/1/06. Statutory Authority: Chapters 18.27, 43.22, and 70.87 RCW. WSR 05-12-032, § 296-150M-3000, filed 5/24/05, effective 6/30/05. Statutory Authority: Chapters 18.27 and 43.22 RCW. WSR 04-12-048, § 296-150M-3000, filed 5/28/04, effective 6/30/04. Statutory Authority: RCW 43.22.340, 43.22.400, 43.22.432, 43.22.433, 43.22.434, 43.22.480, and 43.22.485, 2002 c 268, and chapter 43.22 RCW. WSR 03-12-044, § 296-150M-3000, filed 5/30/03, effective 5/30/03. Statutory Authority: RCW 43.22.350, 43.22.434, 43.22.480, 43.22.500, 18.27.070, 18.27.075, 70.87.030, 19.28.041, 19.28.051, 19.28.101, 19.28.121, 19.28.161, 19.28.201, 19.28.211, 19.28.341, 2001 c 159, and chapters 43.22, 19.28, 18.27, and 70.87 RCW. WSR 01-12-035, § 296-150M-3000, filed 5/29/01, effective 6/29/01. Statutory Authority: RCW 43.22.340, 43.22.350, 43.22.355, 43.22.360, 43.22.400, 43.22.432, 43.22.433, 43.22.434, 43.22.450, 43.22.480, and 43.22.485. WSR 00-17-148, § 296-150M-3000, filed 8/22/00, effective 9/30/00. Statutory Authority: Chapters 43.22, 18.27, 70.87 and 19.28 RCW. WSR 99-12-080, § 296-150M-3000, filed 5/28/99, effective 6/28/99. Statutory Authority: Chapters 18.106, 18.27 and 43.22 RCW. WSR 98-12-041, § 296-150M-3000, filed 5/29/98, effective 6/30/98. Statutory Authority: RCW 70.87.030, 18.27.070, [18.27.]075, 43.22.350, [43.22.]355, [43.22.]434 and [43.22.]480(2). WSR 97-11-053, § 296-150M-3000, filed 5/20/97, effective 6/30/97. Statutory Authority: RCW 43.22.340, [43.22.]355, [43.22.]360, [43.22.]432, [43.22.]440 and [43.22.]480. WSR 96-21-146, § 296-150M-3000, filed 10/23/96, effective 11/25/96.]
(Effective January 1, 2025)
PDFWAC 296-150M-3000
Manufactured/mobile home fees.
DESIGN PLAN FEES: | |||
STRUCTURAL ALTERATION | $229.80 | ||
RESUBMITTAL FEE | $101.30 | ||
ADDENDUM (Approval expires on the same date as original plan.) | $101.30 | ||
ELECTRONIC PLAN SUBMITTAL FEE $6.90 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section. | |||
DEPARTMENT INSPECTION FEES: | |||
Combination permit - Mechanical and electrical inspections | $251.20 | ||
Heat pump | $251.20 | ||
Air conditioning | $251.20 | ||
Air conditioning with replacement furnace | $251.20 | ||
Gas furnace installation includes gas piping | $251.20 | ||
Fire safety inspection | $251.20 | ||
MECHANICAL | |||
Gas*** piping | $111.50 | ||
Wood stove | $111.50 | ||
Pellet stove | $111.50 | ||
Gas*** Room heater | $111.50 | ||
Gas*** Decorative appliance | $111.50 | ||
Range: Changing from electric to gas*** | $111.50 | ||
Gas*** Water heater replacement | $83.40 | ||
ELECTRICAL | |||
Electric water heater replacement | $139.50 | ||
Electric water heater replacing gas*** water heater | $139.50 | ||
Each added or modified 120 volt circuit (maximum charge is two circuits) | $139.50 | ||
Each added 240 volt circuit (for other than heat pumps, air conditioners, furnaces, water heaters, ranges, hot tubs or spas) | $139.50 | ||
Hot tub or spa (power from home electrical panel) | $139.50 | ||
Replace main electrical panel/permanently installed transfer equipment | $139.50 | ||
Low voltage fire/intrusion alarm | $139.50 | ||
Any combination of furnace, range and water heater changing from electric to gas*** | $139.50 | ||
PLUMBING | |||
Fire sprinkler system | $313.70 | ||
Each added fixture | $83.40 | ||
Replacement of water piping system (this includes two inspections) | $280.10 | ||
STRUCTURAL | |||
Inspection as part of a mechanical/fire safety installation (cut truss/floor joist, sheet rocking) | $125.10 | ||
Reroofs (may require a plan review) | $223.70 | ||
Changes to home when additions bear loads on home per the design of a professional (also requires a plan review) | $223.70 | ||
Other structural changes (may require a plan review) | $223.70 | ||
MISCELLANEOUS | |||
OTHER REQUIRED INSPECTIONS (per hour*) | $91.50 | ||
ALL REINSPECTIONS (per hour*) | $91.50 | ||
Manufactured home installation inspection permit (only available in cities and counties with L&I inspection contract) | $641.40 | ||
Refund | $27.50 | ||
INSIGNIA FEES: | |||
REISSUED - LOST/DAMAGED | $27.50 | ||
IPIA | |||
DEPARTMENT AUDIT FEES | |||
REGULARLY SCHEDULED IPIA AUDIT: | |||
First inspection on each section (one time only) | $45.80 | ||
Second and succeeding inspections of unlabeled sections (per hour*) | $101.30 | ||
OTHER IPIA FEES: | |||
Red tag removal during a regularly scheduled IPIA audit (per hour* separate from other fees) | $101.30 | ||
Red tag removal at a time other than a regularly scheduled IPIA audit (per hour* plus travel time* and mileage**) | $101.30 | ||
Increased frequency surveillance (per hour* plus travel time* and mileage**) | $101.30 | ||
Attendance at manufacturers training classes (per hour* only) | $101.30 | ||
Subpart "I" investigations (per hour* plus travel time* and mileage**) | $101.30 | ||
Alterations to a labeled unit (per hour* plus travel time* and mileage**) | $101.30 | ||
IPIA Issues/Responses (per hour* plus travel time* and mileage**) | $101.30 | ||
Monthly surveillance during a regularly scheduled IPIA audit (per hour* plus travel time* and mileage**) | $101.30 | ||
Monthly surveillance at a time other than a regularly scheduled IPIA audit (per hour* plus travel time* and mileage**) | $101.30 | ||
Plant certifications, recertifications and addenda updates (per hour* plus travel time* and mileage** per each inspector) | $101.30 | ||
Response to HBT audit during a regularly scheduled IPIA audit (per hour*) | $101.30 | ||
Response to HBT audit at a time other than a regularly scheduled IPIA audit (per hour* plus travel time* and mileage**) | $101.30 | ||
Alternative construction (AC) letter inspections at placement site (per hour* plus travel time* and mileage**) | $101.30 | ||
Replacement of HUD labels (per hour* plus travel time* and mileage**) | $101.30 | ||
State administrative agency (SAA) inspection fee (per hour* plus travel time* and mileage**) | $101.30 | ||
State administrative agency (SAA) dispute resolution filing fee | $101.30 | ||
State administrative agency (SAA) dispute resolution (per hour*) | $101.30 | ||
OTHER FEES: | |||
FIELD TECHNICAL SERVICE (per hour plus travel time* and mileage**) | $94.20 | ||
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (one free copy per year upon request) | $18.40 | ||
VARIANCE INSPECTION FEE | $223.70 | ||
HOMEOWNER REQUESTED INSPECTION | $223.70 | ||
DECERTIFICATION OF A MOBILE/MANUFACTURED HOME | $223.70 | ||
DEMOLITION OF A MOBILE/MANUFACTURED HOME | $223.70 | ||
ENERGY CONSERVATION PERMIT | $37.80 |
NOTE: | Local jurisdictions may have other fees that apply. |
* | Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments. |
** | Per state guidelines. |
*** | Gas means all gases; natural, propane, etc. |
[Statutory Authority: Chapters 43.22 and 43.22A RCW. WSR 24-21-131, s 296-150M-3000, filed 10/22/24, effective 1/1/25; WSR 23-21-084, § 296-150M-3000, filed 10/17/23, effective 12/1/23; WSR 22-19-074, § 296-150M-3000, filed 9/20/22, effective 11/1/22; WSR 22-01-193, § 296-150M-3000, filed 12/21/21, effective 1/31/22; WSR 21-07-126, § 296-150M-3000, filed 3/23/21, effective 4/23/21; WSR 20-04-081, § 296-150M-3000, filed 2/4/20, effective 3/6/20. Statutory Authority: Chapters 18.27, 70.87, 43.22, and 43.22A RCW. WSR 18-24-102, § 296-150M-3000, filed 12/4/18, effective 1/4/19. Statutory Authority: Chapter 43.22 RCW and 2011 1st sp.s. c 50. WSR 12-06-069, § 296-150M-3000, filed 3/6/12, effective 4/30/12. Statutory Authority: Chapters 18.106, 43.22 RCW, 2008 c 285 and c 329. WSR 08-12-042, § 296-150M-3000, filed 5/30/08, effective 6/30/08. Statutory Authority: Chapters 18.27, 18.106, 43.22, and 70.87 RCW. WSR 07-11-128, § 296-150M-3000, filed 5/22/07, effective 6/30/07. Statutory Authority: Chapter 43.22 RCW. WSR 07-05-063, § 296-150M-3000, filed 2/20/07, effective 4/1/07. Statutory Authority: Chapters 18.106, 43.22, and 70.87 RCW. WSR 06-10-066, § 296-150M-3000, filed 5/2/06, effective 6/30/06. Statutory Authority: Chapter 43.22 RCW and 2005 c 399. WSR 05-24-020, § 296-150M-3000, filed 11/29/05, effective 1/1/06. Statutory Authority: Chapters 18.27, 43.22, and 70.87 RCW. WSR 05-12-032, § 296-150M-3000, filed 5/24/05, effective 6/30/05. Statutory Authority: Chapters 18.27 and 43.22 RCW. WSR 04-12-048, § 296-150M-3000, filed 5/28/04, effective 6/30/04. Statutory Authority: RCW 43.22.340, 43.22.400, 43.22.432, 43.22.433, 43.22.434, 43.22.480, and 43.22.485, 2002 c 268, and chapter 43.22 RCW. WSR 03-12-044, § 296-150M-3000, filed 5/30/03, effective 5/30/03. Statutory Authority: RCW 43.22.350, 43.22.434, 43.22.480, 43.22.500, 18.27.070, 18.27.075, 70.87.030, 19.28.041, 19.28.051, 19.28.101, 19.28.121, 19.28.161, 19.28.201, 19.28.211, 19.28.341, 2001 c 159, and chapters 43.22, 19.28, 18.27, and 70.87 RCW. WSR 01-12-035, § 296-150M-3000, filed 5/29/01, effective 6/29/01. Statutory Authority: RCW 43.22.340, 43.22.350, 43.22.355, 43.22.360, 43.22.400, 43.22.432, 43.22.433, 43.22.434, 43.22.450, 43.22.480, and 43.22.485. WSR 00-17-148, § 296-150M-3000, filed 8/22/00, effective 9/30/00. Statutory Authority: Chapters 43.22, 18.27, 70.87 and 19.28 RCW. WSR 99-12-080, § 296-150M-3000, filed 5/28/99, effective 6/28/99. Statutory Authority: Chapters 18.106, 18.27 and 43.22 RCW. WSR 98-12-041, § 296-150M-3000, filed 5/29/98, effective 6/30/98. Statutory Authority: RCW 70.87.030, 18.27.070, [18.27.]075, 43.22.350, [43.22.]355, [43.22.]434 and [43.22.]480(2). WSR 97-11-053, § 296-150M-3000, filed 5/20/97, effective 6/30/97. Statutory Authority: RCW 43.22.340, [43.22.]355, [43.22.]360, [43.22.]432, [43.22.]440 and [43.22.]480. WSR 96-21-146, § 296-150M-3000, filed 10/23/96, effective 11/25/96.]