HTML has links - PDF has Authentication
296-150C-0220  <<  296-150C-0230 >>   296-150C-0240

PDFWAC 296-150C-0230

What are the insignia application requirements?

(1) If you are requesting insignia for commercial coaches that you intend to manufacture under a new design plan, your completed application must include:
(a) A completed design-plan approval request form;
(b) One complete set of design plans, specifications, engineering analysis, and test procedures and results, plus one additional set for each manufacturing location where the design plan will be used.
(c) At least one set of design plans must have an original wet stamp from a professional engineer or architect licensed in Washington state. We will retain the set with the original wet stamp; and
(d) A one-time initial filing fee, the design-plan fee (if you want us to approve your design plan), and the fee for each insignia. (See WAC 296-150C-3000.)
(2) If you are requesting insignia under an approved design plan, your completed application must include:
(a) A completed insignia application form; and
(b) The fee for each commercial coach insignia (see WAC 296-150C-3000).