COMMERCIAL COACHES
WAC Sections
HTMLPDF | 296-150C-0010 | Authority, purpose, and scope. |
HTMLPDF | 296-150C-0020 | What definitions apply to this chapter? |
HTMLPDF | 296-150C-0030 | How is this chapter enforced? |
HTMLPDF | 296-150C-0040 | Will you keep my manufacturing information confidential? |
HTMLPDF | 296-150C-0050 | Can you prohibit the sale or lease of my commercial coach? |
HTMLPDF | 296-150C-0060 | Who handles consumer complaints about commercial coaches? |
HTMLPDF | 296-150C-0070 | Do you have reciprocal agreements with other states to inspect commercial coaches? |
HTMLPDF | 296-150C-0080 | Do you allow a local enforcement agency to inspect commercial coaches at the manufacturing location? |
HTMLPDF | 296-150C-0100 | What happens if I disagree with your decision regarding my compliance with this chapter? |
HTMLPDF | 296-150C-0110 | Do you have an advisory board to address commercial coach issues? |
HTMLPDF | 296-150C-0120 | Where can I obtain technical assistance regarding commercial coaches? |
HTMLPDF | 296-150C-0140 | Do you allow the use of alternate materials, alternate design and method of construction? |
HTMLPDF | 296-150C-0150 | How does the department regulate commercial coaches that are used as medical units as defined in chapter 296-150V WAC? |
INSIGNIA | ||
HTMLPDF | 296-150C-0200 | Who must obtain commercial coach insignia? |
HTMLPDF | 296-150C-0210 | What are the insignia requirements? |
HTMLPDF | 296-150C-0220 | How do I obtain insignia information and the required forms? |
HTMLPDF | 296-150C-0230 | What are the insignia application requirements? |
HTMLPDF | 296-150C-0240 | What documentation do you need to perform an alteration inspection? |
HTMLPDF | 296-150C-0250 | How do I replace lost or damaged insignia? |
DESIGN PLAN | ||
HTMLPDF | 296-150C-0300 | When is design-plan approval required? |
HTMLPDF | 296-150C-0310 | Who can approve design plans? |
DESIGN-PLAN APPROVAL BY THE DEPARTMENT | ||
HTMLPDF | 296-150C-0320 | What must I provide with my request for commercial coach design-plan approval by the department? |
HTMLPDF | 296-150C-0340 | What must an engineering analysis for design plans include? |
HTMLPDF | 296-150C-0350 | What must test procedures and results for design plans include? |
HTMLPDF | 296-150C-0380 | What happens if you approve my design plan? |
HTMLPDF | 296-150C-0390 | If my design plan is not approved, how much time do I have to submit a corrected design plan? |
HTMLPDF | 296-150C-0400 | What happens after my design plan is approved? |
HTMLPDF | 296-150C-0410 | When does my design plan expire? |
HTMLPDF | 296-150C-0415 | Who approves addendums to design plans approved by the department? |
DESIGN-PLAN APPROVAL BY A LICENSED PROFESSIONAL OR FIRM | ||
HTMLPDF | 296-150C-0420 | Who can be authorized to approve design plans? |
HTMLPDF | 296-150C-0430 | What information must a professional or firm provide to be authorized to approve design plans? |
HTMLPDF | 296-150C-0440 | How will I know whether I am authorized to approve design plans? |
HTMLPDF | 296-150C-0450 | How long is a licensed professional or firms authorization effective? |
HTMLPDF | 296-150C-0460 | What information must a manufacturer send to the department when a professional or firm does the design-plan approval? |
HTMLPDF | 296-150C-0470 | What happens after we receive the professional or firm approved design plan and information? |
HTMLPDF | 296-150C-0480 | Do you have a list of professionals or firms that are authorized to approve design plans? |
HTMLPDF | 296-150C-0490 | Who approves addendums to design plans approved by a professional or firm? |
HTMLPDF | 296-150C-0495 | Contractor deposit accounts. |
INSPECTIONS PRIOR TO ISSUANCE OF AN INSIGNIA | ||
HTMLPDF | 296-150C-0500 | When is an inspection required? |
HTMLPDF | 296-150C-0510 | How do I request an inspection? |
HTMLPDF | 296-150C-0520 | What happens if my commercial coach passes inspection? |
HTMLPDF | 296-150C-0530 | Am I charged if I request an inspection but I am not prepared? |
HTMLPDF | 296-150C-0540 | Who inspects commercial coach installation at the building site? |
HTMLPDF | 296-150C-0550 | Do you allow a commercial coach to be completed at the installation site? |
HTMLPDF | 296-150C-0560 | What happens if I receive a notice of noncompliance after inspection of the alteration to my commercial coach? |
USED COMMERCIAL COACHES WITHOUT AN INSIGNIA | ||
HTMLPDF | 296-150C-0580 | Must I obtain an insignia for used commercial coaches? |
HTMLPDF | 296-150C-0590 | How do I obtain insignia for used commercial coaches? |
MANUFACTURER'S NOTICE TO THE DEPARTMENT | ||
HTMLPDF | 296-150C-0700 | Must manufacturers of commercial coaches notify you if they manufacture at more than one location? |
HTMLPDF | 296-150C-0710 | Must manufacturers of commercial coaches notify you of a change in business name or address? |
HTMLPDF | 296-150C-0720 | Must manufacturers of commercial coaches notify you of a change in business ownership? |
COMMERCIAL COACH CONSTRUCTION CODE GENERAL | ||
HTMLPDF | 296-150C-0800 | What manufacturing codes apply to commercial coaches? |
HTMLPDF | 296-150C-0805 | Are there any special requirements for portable school classrooms? |
HTMLPDF | 296-150C-0810 | Construction definitions. |
STRUCTURAL | ||
HTMLPDF | 296-150C-0820 | What are the basic structural requirements of a commercial coach? |
HTMLPDF | 296-150C-0830 | Fastening of structural systems. |
HTMLPDF | 296-150C-0840 | Live loads. |
HTMLPDF | 296-150C-0850 | Roof loads. |
HTMLPDF | 296-150C-0860 | Snow loads. |
HTMLPDF | 296-150C-0870 | Standard wind loads. |
HTMLPDF | 296-150C-0880 | Windstorm protection—Provisions for support and anchoring. |
HTMLPDF | 296-150C-0900 | Interior walls and partitions. |
HTMLPDF | 296-150C-0910 | Minimum uniform and concentrated live loads. |
HTMLPDF | 296-150C-0920 | Design load deflection. |
HTMLPDF | 296-150C-0930 | Structural load tests. |
CONSTRUCTION | ||
HTMLPDF | 296-150C-0940 | Fastening of structural systems. |
HTMLPDF | 296-150C-0950 | Roof coverings/membrane/weather resistant. |
HTMLPDF | 296-150C-0960 | What requirements apply to commercial coach roof trusses? |
HTMLPDF | 296-150C-0970 | Roof construction. |
HTMLPDF | 296-150C-0990 | Sealing wall exterior openings. |
HTMLPDF | 296-150C-1000 | Drilling or notching of wood wall structural members. |
HTMLPDF | 296-150C-1020 | Wall construction. |
HTMLPDF | 296-150C-1030 | Fire-blocking. |
HTMLPDF | 296-150C-1040 | Floors. |
HTMLPDF | 296-150C-1050 | Drilling or notching of wood joist structural members. |
HTMLPDF | 296-150C-1060 | Fastening of structural systems. |
HTMLPDF | 296-150C-1070 | Floor closure material. |
HTMLPDF | 296-150C-1080 | What design and construction requirements apply to a commercial coach chassis? |
MATERIALS | ||
HTMLPDF | 296-150C-1090 | Standards for equipment and installations. |
HTMLPDF | 296-150C-1100 | Flame-spread limitations. |
HTMLPDF | 296-150C-1110 | Combustible limitations. |
HTMLPDF | 296-150C-1120 | Kitchen cabinet protection. |
HTMLPDF | 296-150C-1130 | Insulation standards. |
HTMLPDF | 296-150C-1140 | Room sizes. |
HTMLPDF | 296-150C-1150 | Hallways. |
HTMLPDF | 296-150C-1160 | Accessibility standards. |
HTMLPDF | 296-150C-1170 | What are the lighting and ventilation requirements of a commercial coach? |
HTMLPDF | 296-150C-1175 | Glass and glazed openings. |
HTMLPDF | 296-150C-1180 | Commercial coach exits. |
HTMLPDF | 296-150C-1190 | Interior privacy. |
HTMLPDF | 296-150C-1195 | Fire warning equipment—Automatic smoke detectors. |
HTMLPDF | 296-150C-1200 | Installation instructions. |
HTMLPDF | 296-150C-1210 | Table: Number of ties required per side of commercial coach. |
ELECTRICAL | ||
HTMLPDF | 296-150C-1220 | Electrical—General. |
HTMLPDF | 296-150C-1230 | Electrical definitions. |
HTMLPDF | 296-150C-1240 | Branch circuit and feeder calculations. |
HTMLPDF | 296-150C-1250 | Disconnecting means and branch circuit protective equipment. |
HTMLPDF | 296-150C-1260 | Power supply—Feeder assembly equipment. |
HTMLPDF | 296-150C-1270 | Identification of feeder assembly connection. |
HTMLPDF | 296-150C-1280 | Wiring methods—Wiring of expandable or multiple units. |
HTMLPDF | 296-150C-1290 | Under-chassis wiring. |
HTMLPDF | 296-150C-1300 | Equipment mounting. |
HTMLPDF | 296-150C-1303 | How must storage batteries be installed in a commercial coach? |
HTMLPDF | 296-150C-1310 | Grounding—General. |
HTMLPDF | 296-150C-1320 | Dielectric strength test. |
MECHANICAL | ||
HTMLPDF | 296-150C-1330 | Mechanical—General. |
HTMLPDF | 296-150C-1340 | Mechanical definitions. |
HTMLPDF | 296-150C-1346 | When HVAC equipment is supplied with more than one CFM rating, which rating do I use? |
HTMLPDF | 296-150C-1350 | LPG system enclosure and mounting. |
HTMLPDF | 296-150C-1360 | Gas piping—Piping design. |
HTMLPDF | 296-150C-1370 | Gas piping—Expandable or multiple commercial coaches. |
HTMLPDF | 296-150C-1380 | Concealed tubing. |
HTMLPDF | 296-150C-1390 | Gas piping—Pipe-joint compound. |
HTMLPDF | 296-150C-1400 | Gas piping—Hangers and supports. |
HTMLPDF | 296-150C-1410 | Gas piping—Electrical ground. |
HTMLPDF | 296-150C-1420 | Identification of gas supply connections. |
HTMLPDF | 296-150C-1430 | Gas piping system openings. |
HTMLPDF | 296-150C-1440 | Gas piping—Valves. |
HTMLPDF | 296-150C-1450 | Gas piping—Testing for leakage before appliances are connected. |
HTMLPDF | 296-150C-1460 | Gas piping—Testing for leakage after appliances are connected. |
VENTILATION AND INDOOR AIR QUALITY | ||
HTMLPDF | 296-150C-1470 | Ventilation and indoor air quality—General. |
HTMLPDF | 296-150C-1480 | Ventilation and indoor air quality definitions. |
HTMLPDF | 296-150C-1490 | Appliances—Installation. |
HTMLPDF | 296-150C-1500 | Safety devices—Water heater relief valves. |
HTMLPDF | 296-150C-1510 | Air ducts—Expandable or multiple commercial coach connections. |
HTMLPDF | 296-150C-1520 | Air ducts—Duct and plenum insulation. |
PLUMBING | ||
HTMLPDF | 296-150C-1530 | Plumbing—General. |
HTMLPDF | 296-150C-1540 | Plumbing—Definitions. |
HTMLPDF | 296-150C-1545 | Does the department require a water system expansion tank be installed? |
HTMLPDF | 296-150C-1550 | Drainage—Cap or plug. |
HTMLPDF | 296-150C-1560 | Drainage—Clearance from drain outlet. |
HTMLPDF | 296-150C-1570 | Water supply connection. |
COMMERCIAL COACH FEES | ||
HTMLPDF | 296-150C-3000 | Commercial coach fees. |