PDFWAC 296-96-01008
Decommissioning a conveyance.
A licensed elevator mechanic working for a licensed elevator company shall decommission the conveyance according to ASME A17.1/CSA B44. If the elevator is the only one in the building and the owner/agent wants the conveyance decommissioned the owner/agent shall obtain a letter of approval from the local building official.
Note: | Decommissioning is not removing the conveyance. |
(1) After decommissioning work is complete:
(a) The elevator mechanic shall contact the department to schedule an inspection;
(b) The department will perform an inspection and send the results and applicable fee to the conveyance owner;
(c) Upon inspection and approval by the department, annual inspections will no longer be required, until such time that the conveyance is returned to service.
(2) Prior to returning a decommissioned conveyance to service an acceptance inspection and temporary operating permit shall be obtained. The conveyance acceptance inspection shall be performed to the code in effect from the date of its original installation and/or alteration.
[Statutory Authority: Chapter 70.87 RCW. WSR 18-18-070, § 296-96-01008, filed 8/31/18, effective 10/1/18; WSR 13-24-066, § 296-96-01008, filed 11/27/13, effective 1/1/14.]