These documents are currently being revised to incorporate the changes made during the 2024 Legislative Session. Please consult the Sections Affected Table for changes made during the 2024 Legislative Session.

Chapter 80.50 RCW Dispositions

ENERGY FACILITIES — SITE LOCATIONS

Current RCWs

Sections

80.50.050  Adoption of council guidelines as rules.
[1975-'76 2nd ex.s. c 108 § 33; 1970 ex.s. c 45 § 5.]
Repealed by 1977 ex.s. c 371 § 19.


80.50.070  Applications for site certification — Fee — Study.
[1975-'76 2nd ex.s. c 108 § 35; 1970 ex.s. c 45 § 7.]
Repealed by 1977 ex.s. c 371 § 19.


80.50.170  Study of potential sites — Intent of RCW 80.50.175.
[1975-'76 2nd ex.s. c 108 § 39; 1974 ex.s. c 110 § 1.]
Repealed by 1977 ex.s. c 371 § 19.


80.50.190  Disposition of receipts from applicants.
[1977 ex.s. c 371 § 15.]
Repealed by 2022 c 183 § 25.


80.50.350  National interest electric transmission corridors task force — Duties — Recommendations.
[2007 c 326 § 2.]
Expired July 1, 2009.


80.50.800  Rules of thermal plant site evaluation council to continue until amended or rescinded.
[1975-'76 2nd ex.s. c 108 § 42.]
Decodified August 1990.


80.50.900  Severability-1970 ex.s. c 45.
[1970 ex.s. c 45 § 17.]
Decodified by the code reviser, July 2016.


80.50.901  Severability-1974 ex.s. c 110.
[1974 ex.s. c 110 § 3.]
Decodified by the code reviser, July 2016.


80.50.902  Severability-1977 ex.s. c 371.
[1977 ex.s. c 371 § 20.]
Decodified by the code reviser, July 2016.


80.50.903  Severability-1996 c 4.
[1996 c 4 § 5.]
Decodified by the code reviser, July 2016.


80.50.904  Effective date-1996 c 4.
[1996 c 4 § 6.]
Repealed by 2022 c 183 § 25.


Site Contents
Selected content listed in alphabetical order under each group