PDFWAC 296-150I-0120
Manufactured home installation permit and inspections—Obligation of the dealer and certified installer.
(1) A certified installer must assure that a placement permit for the manufactured home installation has been purchased from the local enforcement agency. The certified installer shall ensure that all required installation inspections, relative to the work performed by the certified installer, are completed.
(2) Installer certification does not eliminate any contractor registration requirements of chapter 18.27 RCW.
(3) An out-of-state manufactured/mobile home dealer who performs installation work must comply with the contractor registration requirements of chapter 18.27 RCW. The manufactured/mobile home dealer must employ at least one certified installer to supervise the installation.
[Statutory Authority: Chapters 43.22 and 43.22A RCW. WSR 22-01-193, § 296-150I-0120, filed 12/21/21, effective 1/31/22. Statutory Authority: Chapter 43.22A RCW and 2009 c 464 [564]. WSR 10-06-043, § 296-150I-0120, filed 2/23/10, effective 4/1/10. Statutory Authority: Chapter 43.22A RCW and 2007 c 432. WSR 08-12-040, § 296-150I-0120, filed 5/30/08, effective 6/30/08.]