HTML has links - PDF has Authentication
246-296-120  <<  246-296-130 >>   246-296-140

PDFWAC 246-296-130

Project priority rating and ranking criteria.

The department shall, at a minimum, consider the following to assign points, and rate and rank proposed projects:
(1) Criteria for risk categories and points based on:
(a) Type and significance of public health problems the project will resolve;
(b) If the project is needed to bring the public water system into compliance with federal, state, and local drinking water requirements; and
(c) Current compliance status.
(2) Additional points based on the type of project being proposed if the project:
(a) Is ready to proceed to construction;
(b) Completes projects previously funded by DWARF grants or loans;
(c) Is to consolidate or restructure multiple public water systems;
(d) Creates a sustainable regional public health benefit;
(e) Is a water main replacement project that coincides with other infrastructure projects;
(f) Qualifies as a green project; or
(g) Serves a disadvantaged community.
[Statutory Authority: RCW 70A.125.160, Federal Safe Drinking Water Act. WSR 24-16-058, § 246-296-130, filed 7/31/24, effective 8/31/24. Statutory Authority: RCW 70.119A.170 as amended by 2016 c 111. WSR 16-14-086, § 246-296-130, filed 7/5/16, effective 8/5/16. Statutory Authority: RCW 70.119A.170 and Federal Safe Drinking Water Act, H.R. 1452. WSR 12-01-077, § 246-296-130, filed 12/19/11, effective 2/1/12. Statutory Authority: RCW 70.119A.170. WSR 01-21-137, § 246-296-130, filed 10/24/01, effective 11/24/01.]
Site Contents
Selected content listed in alphabetical order under each group