HTML has links - PDF has Authentication
344-12-075  <<  344-12-078 >>   344-12-080

PDFWAC 344-12-078

Directional drilling.

Before beginning directional drilling, other than sidetracking due to hole conditions, the operator shall file a request for same and obtain approval from the supervisor. Such request shall state name and address of operator, well name and number, drilling permit number, exact surface location of well bore and the proposed direction of deviation, proposed horizontal distance between bottom of the hole and the surface location, reason for directional drilling and a list of direct offset operators towards whom the well is being drilled, if any. Within sixty days after completion of the work an accurate and complete copy of the directional survey shall be filed with the supervisor.
[Statutory Authority: RCW 78.52.050 and chapter 78.52 RCW. WSR 82-12-052 (Order 3, Resolution No. 7), ยง 344-12-078, filed 6/1/82.]