PDFWAC 296-874-30008
Make sure tiebacks meet these requirements.
(1) You must make sure tiebacks are equivalent in strength to the suspension ropes.
(2) You must make sure tiebacks are secured to a structurally sound anchorage on the building or structure and installed:
(a) At a right angle (perpendicular) to the face of the building or structure; or
(b) As opposing angle tiebacks.