PDFWAC 296-806-42064
Provide slack-cable switches on hoists.
You must provide and arrange slack cable switches to cut power to the drive and set the brake when the skip or counterweight hoisting ropes either:
(1) Develop slack; or
(2) Lose tension due to sticking in the guides, over travel, or for any other reason.