PDFWAC 296-307-22506

The rated load must be marked on a jack.

(1) The operator must make sure that the jack used has a load rating sufficient to lift and sustain the load.
(2) The rated load must be legibly and permanently marked in a prominent location on the jack by casting, stamping, or other suitable means.
Note:
The operator should follow the manufacturer's specifications to raise the rated load of a jack.
[Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, and 49.17.060. WSR 20-21-091, § 296-307-22506, filed 10/20/20, effective 11/20/20. WSR 97-09-013, recodified as § 296-307-22506, filed 4/7/97, effective 4/7/97. Statutory Authority: RCW 49.17.040, [49.17.]050 and [49.17.]060. WSR 96-22-048, § 296-306A-22506, filed 10/31/96, effective 12/1/96.]