PDFWAC 296-150R-0560
What information must a manufacturer send to the department when a professional or firm does the design-plan approval?
You must send us the following information in your approved design plans:
(1) A completed departmental design-plan approval request form;
(2) A set of design plan drawings and specifications necessary for a complete code evaluation of the design;
(3) A cover sheet on the design plan noting which professional approved each portion of the design plan;
(4) A copy of the authorization letter from us; and
(5) The design plan fee for design plans approved by professionals or firms. (See WAC 296-150R-3000.)
[Statutory Authority: Chapter 43.22 RCW. WSR 23-09-024, ยง 296-150R-0560, filed 4/11/23, effective 4/11/23.]