PDFWAC 194-22-090
Curtailment administration—Excess power consumption.
Excess power consumption is calculated at each utility's discretion as one of two values: Actual or estimated load minus curtailment target; or weather-normalized load minus curtailment target. Enforcement measures (see WAC 194-22-110, mandatory curtailment enforcement) will only be assessed on excess power consumption if a consumer's actual, estimated or weather-normalized load is greater than the threshold consumption level.
[Statutory Authority: RCW 43.21F.045. WSR 94-20-103, § 194-22-090, filed 10/4/94, effective 11/4/94.]