HTML has links - PDF has Authentication
372-36-100  <<  372-36-110 >>   372-36-120

PDFWAC 372-36-110

Specific requirements of each industry—Sand and gravel washing.

No sand and gravel washings will be discharged to a drain or wasteway unless first passed through a lagoon with a settling period of 2 days.
[Rule .04.243 (C)(6), filed 3/1/60.]
Site Contents
Selected content listed in alphabetical order under each group