(i) Telecommunications - Annual permit fee. |
Notes: (2) Annual inspection time required may be estimated by the purchaser at the rate for "other inspections" in this section, charged portal-to-portal per hour. |
For commercial/industrial location employing full-time telecommunications maintenance staff or having a yearly maintenance contract with a licensed electrical/telecommunications contractor. |
2-hour minimum | $212.40 |
Each additional hour, or portion thereof, of portal-to-portal inspection time | $105.90 |
(j) Permit requiring ditch cover inspection only. |
Each 1/2 hour, or portion thereof | $52.60 |
(k) Cover inspection for elevator/conveyance installation. This item is only available to a licensed/registered elevator contractor. | $88.80 |
(6) Carnival inspections. |
(a) First carnival field inspection each calendar year. |
(i) Each ride and generator truck | $24.70 |
(ii) Each remote distribution equipment, concession, or gaming show | $7.30 |
(iii) If the calculated fee for first carnival field inspection above is less than $113.10, the minimum inspection fee will be: | $133.40 |
(b) Subsequent carnival inspections. |
(i) First 10 rides, concessions, generators, remote distribution equipment, or gaming show | $133.40 |
(ii) Each additional ride, concession, generator, remote distribution equipment, or gaming show | $7.30 |
(c) Concession(s) or ride(s) not part of a carnival. |
(i) First field inspection each year of a single concession or ride, not part of a carnival | $105.90 |
(ii) Subsequent inspection of a single concession or ride, not part of a carnival | $69.60 |
(7) Trip fees. | |
(a) Requests by property owners to inspect existing installations. (This fee includes a maximum of one hour of inspection time. All inspection time exceeding one hour will be charged at the rate for progressive inspections.) | $105.90 |
(b) Submitter notifies the department that work is ready for inspection when it is not ready. | $52.60 |
(c) Additional inspection required because submitter has provided the wrong address or incomplete, improper or illegible directions for the site of the inspection. | $52.60 |
(d) More than one additional inspection required to inspect corrections; or for repeated neglect, carelessness, or improperly installed electrical work. | $52.60 |
(e) Each trip necessary to remove a noncompliance notice. | $52.60 |
(f) Corrections that have not been made in the prescribed time, unless an exception has been requested and granted. | $52.60 |
(g) Installations that are covered or concealed before inspection. | $52.60 |
(8) Progress inspections. | |
Note: The fees calculated in subsections (1) through (6) of this section will apply to all electrical work. This section will be applied to a permit where the permit holder has requested additional inspections beyond the number supported by the permit fee calculated at the rate in subsections (1) through (6) of this section. |
On partial or progress inspections, each 1/2 hour. | $52.60 |
(9) Plan review. | |
(a) Plan review fee is 35% of the electrical work permit fee as determined by WAC 296-46B-906. | 35% |
(b) Plan review submission fee . | $88.80 |
(c) Supplemental submissions of plans per hour or fraction of an hour of review time. | $105.90 |
(d) Plan review handling fee. | $24.70 |
(10) Out-of-state inspections. | |
(a) Permit fees will be charged according to the fees listed in this section. |
(b) Travel expenses: |
All travel expenses and per diem for out-of-state inspections are billed following completion of each inspection(s). These expenses can include, but are not limited to: Inspector's travel time, travel cost and per diem at the state rate. Travel time is hourly based on the rate in subsection (11) of this section. |
(11) Other inspections. |
Inspections not covered by above inspection fees must be charged portal-to-portal per hour: | $105.90 |
(12) Variance request processing fee. |
Variance request processing fee. This fee is nonrefundable once the transaction has been validated. | $105.90 |
(13) Class B basic electrical work labels. | |
(a) Block of 20 Class B basic electrical work labels (not refundable). | $291.10 |
(b) Reinspection of Class B basic electrical work to assure that corrections have been made (per 1/2 hour timed from leaving the previous inspection until the reinspection is completed). See WAC 296-46B-908(5). | $52.60 |
(c) Reinspection of Class B basic electrical work because of a failed inspection of another Class B label (per 1/2 hour from previous inspection until the reinspection is completed). See WAC 296-46B-908(5). | $52.60 |
(14) Provisional electrical work permit labels. |
Block of 20 provisional electrical work permit labels. | $291.10 |