LRP funds requested and allowed to a project are limited to the match requirements established by county road administration board at the time of call for projects developed in conjunction with policy following RCW 36.170.060. The match requirements will be applied to the total eligible project development costs, which may include preliminary engineering and construction costs for all project types identified in WAC 136-710-020 and right-of-way costs for project types identified in WAC 136-710-020 (2) through (6).
Even though additional and eligible project development costs may be incurred by a county for a specific project, the maximum amount of LRP funds for that project is limited to the amount allocated and shown in the CRAB/county contract, unless the allocation is increased pursuant to WAC 136-740-020.
[Statutory Authority: RCW 36.78.070 and 36.170.010. WSR 26-08-028, s 136-720-070, filed 3/23/26, effective 4/23/26.]