HTML has links - PDF has Authentication
51-11C-40804  <<  51-11C-408045 >>   51-11C-40805

PDFWAC 51-11C-408045

Section C408.5Other systems commissioning.

C408.5 Systems installed to meet Section C406 or C407. Equipment, components, controls or configuration settings for mechanical, service water heating, electrical power or lighting systems which are included in the project to comply with Section C406 or C407 shall be included in the commissioning process required by Section C408.1.
[Statutory Authority: RCW 19.27A.025, 19.27A.160, and 19.27.074. WSR 16-03-072, § 51-11C-408045, filed 1/19/16, effective 7/1/16.]
Site Contents
Selected content listed in alphabetical order under each group