HTML has links - PDF has Authentication
468-16-200  <<  468-16-210 >>   End of Chapter

PDFWAC 468-16-210

Prime contractor performance report.

(1) The evaluation of contractor performance shall be made on a form substantially in the format as illustrated herein.
(2) A Prime Contractor Performance Report Manual provides detailed instructions for preparation of the prime contractor performance report.
[Statutory Authority: RCW 47.28.070. WSR 23-23-165, § 468-16-210, filed 11/21/23, effective 12/22/23. Statutory Authority: RCW 47.01.101, 47.28.030, and 47.28.070. WSR 15-01-170, § 468-16-210, filed 12/23/14, effective 1/23/15; WSR 94-05-004, § 468-16-210, filed 2/2/94, effective 3/5/94; WSR 91-04-014 (Order 128), § 468-16-210, filed 1/28/91, effective 2/28/91.]
Site Contents
Selected content listed in alphabetical order under each group