Land boundary survey standards.
The following standards shall apply to land boundary surveys:
(1) The accuracy or precision of field work may be determined and reported using either relative accuracy standards or field traverse standards, provided that field work not capable of analysis with field traverse standards must be evaluated using relative accuracy standards and procedures. Final results must meet or exceed the appropriate standards as contained in WAC
332-130-085 or
332-130-090.
(2) The datum when using the Washington Plane Coordinate System shall be as officially adjusted and published by the National Geodetic Survey of the United States Department of Commerce as established in accordance with chapter
58.20 RCW. The datum tag and the coordinate epoch date shall be reported on all documents prepared which reference the Washington Plane Coordinate System.
[Statutory Authority: RCW
58.24.040(1). WSR 19-01-045, § 332-130-070, filed 12/13/18, effective 1/13/19. Statutory Authority: Chapter
58.24 RCW. WSR 05-13-104, § 332-130-070, filed 6/17/05, effective 7/18/05. Statutory Authority: RCW
58.24.040(1). WSR 90-06-028 (Order 568), § 332-130-070, filed 3/1/90, effective 4/1/90; WSR 89-11-028 (Order 561), § 332-130-070, filed 5/11/89; Order 275, § 332-130-070, filed 5/2/77.]