HTML has links - PDF has Authentication
296-32-23534  <<  296-32-23536 >>   296-32-24005

PDFWAC 296-32-23536

Lead work.

(1) Employer program requirements.
(a) General activities exposing employees to lead hazards the employer must follow the requirements located in WAC 296-62-07521.
(b) Construction activities exposing employees to lead hazards must follow the requirements located in WAC 296-155-176.
(2) When operated from commercial power the metal housing of electric solder pots must be grounded. Electric solder pots may be used with the power equipment described in WAC 296-32-22540 (6) and (7), without a grounding conductor.
(3) Wiping gloves or cloths and eye protection must be used in lead wiping operations.
(4) A drip pan to catch hot lead drippings must be provided and used.
[Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, and 49.17.060. WSR 20-20-109, § 296-32-23536, filed 10/6/20, effective 11/6/20. Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, 49.17.060, and chapter 49.17 RCW. WSR 17-20-069, § 296-32-23536, filed 10/2/17, effective 1/1/18.]
Site Contents
Selected content listed in alphabetical order under each group