HTML has links - PDF has Authentication
296-150R-0850  <<  296-150R-0860 >>   296-150R-0870

PDFWAC 296-150R-0860

After becoming self-certified, do I need approval to change my comprehensive design plan?

(1) Once you are self-certified, you are not required to send us your comprehensive design plans nor are we required to approve your comprehensive design plan changes.
(2) You are required to maintain your comprehensive design plans for each model at each manufacturing location where the models are produced.
[Statutory Authority: RCW 43.22.340, [43.22.]355, [43.22.]360, [43.22.]432, [43.22.]440 and [43.22.]480. WSR 96-21-146, ยง 296-150R-0860, filed 10/23/96, effective 11/25/96.]
Site Contents
Selected content listed in alphabetical order under each group