PART 1 GENERAL PROVISIONS FOR CHEMIGATION OPERATIONS |
HTMLPDF | 16-202-1001 | What is the purpose of this chapter? |
HTMLPDF | 16-202-1002 | How are specific terms and phrases defined in this chapter? |
PART 2 GENERAL REQUIREMENTS FOR CHEMIGATION OPERATIONS |
HTMLPDF | 16-202-1003 | What are the general requirements in performing a chemigation operation? |
HTMLPDF | 16-202-1004 | Who may calibrate, load, start up, operate, monitor, or shut down a chemigation system? |
HTMLPDF | 16-202-1005 | What are the site posting requirements for chemigation? |
HTMLPDF | 16-202-1006 | What are the recordkeeping requirements for an application? |
HTMLPDF | 16-202-1007 | What are the identification requirements for application tanks? |
HTMLPDF | 16-202-1008 | What are the placement requirements for application tanks? |
HTMLPDF | 16-202-1009 | Under what conditions is an application tank exempt from secondary and operational area containment rules? |
HTMLPDF | 16-202-1010 | How should rinsate or backflush water from a filtration device be handled? |
PART 3 SAFETY REQUIREMENTS FOR CHEMIGATION SYSTEMS |
HTMLPDF | 16-202-1011 | What are the general antipollution safety device requirements for a chemigation system? |
HTMLPDF | 16-202-1012 | What measures must be used to prevent backflow into the irrigation water source? |
HTMLPDF | 16-202-1013 | What alternative methods may be used to prevent backflow into the irrigation water source? |
HTMLPDF | 16-202-1014 | What are the prevention requirements for backflow into or seepage from application tanks? |
HTMLPDF | 16-202-1015 | What alternative methods may be used to prevent backflow into or seepage from application tanks? |
HTMLPDF | 16-202-1016 | What are the requirements for metering devices? |
HTMLPDF | 16-202-1017 | What are alternative methods for metering? |
HTMLPDF | 16-202-1018 | What are the requirements for product injection devices? |
HTMLPDF | 16-202-1019 | What alternative methods may be used for product injection? |
HTMLPDF | 16-202-1020 | What are the requirements for a system interlock? |
HTMLPDF | 16-202-1021 | What alternative methods can be used as a system interlock? |
HTMLPDF | 16-202-1022 | What is an appropriate monitoring schedule? |
HTMLPDF | 16-202-1023 | Public water system cross-connections or connections to a potable water supply intended for human use. |
PART 4 PENALTIES AND PENALTY ASSIGNMENT SCHEDULE FOR CHEMIGATION OPERATIONS |
HTMLPDF | 16-202-1024 | Penalties. |
PART 5 GENERAL PROVISIONS FOR FERTIGATION OPERATIONS |
HTMLPDF | 16-202-2001 | What is the purpose of this chapter? |
HTMLPDF | 16-202-2002 | How are specific terms and phrases defined in this chapter? |
PART 6 GENERAL REQUIREMENTS FOR FERTIGATION OPERATIONS |
HTMLPDF | 16-202-2003 | What are the general requirements in performing a fertigation operation? |
HTMLPDF | 16-202-2004 | What are the identification requirements for application tanks? |
HTMLPDF | 16-202-2005 | What are the placement requirements for application tanks? |
HTMLPDF | 16-202-2006 | Under what conditions is an application tank exempt from the secondary and operational area containment rules? |
HTMLPDF | 16-202-2007 | How should rinsate from equipment or backflush water from a filtration device be handled? |
PART 7 SAFETY REQUIREMENTS FOR FERTIGATION SYSTEMS |
HTMLPDF | 16-202-2008 | What are the general antipollution safety device requirements for a fertigation system? |
HTMLPDF | 16-202-2009 | What measures must be used to prevent backflow into the irrigation water source? |
HTMLPDF | 16-202-2010 | What alternative methods may be used to prevent backflow into the irrigation water source? |
HTMLPDF | 16-202-2011 | What are the prevention requirements for backflow into or seepage from application tanks? |
HTMLPDF | 16-202-2012 | What alternative methods may be used to prevent backflow into or seepage from application tanks? |
HTMLPDF | 16-202-2013 | What are the requirements for metering devices? |
HTMLPDF | 16-202-2014 | What are alternative methods for metering? |
HTMLPDF | 16-202-2015 | What are the requirements for product injection devices? |
HTMLPDF | 16-202-2016 | What alternative methods may be used for product injection? |
HTMLPDF | 16-202-2017 | What are the requirements for a system interlock? |
HTMLPDF | 16-202-2018 | What alternative methods can be used as a system interlock? |
HTMLPDF | 16-202-2019 | What is an appropriate monitoring schedule? |
HTMLPDF | 16-202-2020 | Public water system cross-connections or connection to a potable water supply intended for human use. |
PART 8 PENALTIES AND PENALTY ASSIGNMENT SCHEDULE FOR FERTIGATION OPERATIONS |
HTMLPDF | 16-202-2021 | Penalties. |