18.104.048  <<  18.104.049 >>   18.104.050

Modification of construction standards.

The department by rule shall adopt procedures to permit a well operator to modify construction standards to meet unforeseen circumstances encountered during the construction of a well. The procedures shall be developed in consultation with the technical advisory group established in RCW 18.104.190.
Site Contents
Selected content listed in alphabetical order under each group