HTML has links - PDF has Authentication

Chapter 296-150F WAC

|Hide DispositionsLast Update: 10/22/24

FACTORY-BUILT HOUSING AND COMMERCIAL STRUCTURES

WAC Sections

HTMLPDF296-150F-0010Authority, purpose, and scope.
HTMLPDF296-150F-0020What definitions apply to this chapter?
HTMLPDF296-150F-0030How is this chapter enforced?
HTMLPDF296-150F-0040Will you keep my manufacturing information confidential?
HTMLPDF296-150F-0050Can you prohibit the installation of factory-built housing and commercial structures?
HTMLPDF296-150F-0070 Do you have reciprocal agreements with other states to inspect factory-built housing and commercial structures, and components?
HTMLPDF296-150F-0080 Do you allow a local enforcement agency to inspect factory-built housing, commercial structures, and components at the manufacturing location?
HTMLPDF296-150F-0090What are the requirements for certified plumbers and electricians?
HTMLPDF296-150F-0100What happens if I disagree with your decision regarding my compliance with this chapter?
HTMLPDF296-150F-0110 Do you have an advisory board to address factory-built housing and commercial structure issues?
HTMLPDF296-150F-0120 Where can I obtain technical assistance regarding factory-built housing and commercial structures?
HTMLPDF296-150F-0130How do I register a complaint?
HTMLPDF296-150F-0140Do you allow the use of alternate materials, alternate design and method of construction?
INSIGNIA
HTMLPDF296-150F-0200 Who must purchase factory-built housing and commercial structure insignia?
HTMLPDF296-150F-0210 What are the insignia requirements?
HTMLPDF296-150F-0220 How do I obtain insignia information and the required forms?
HTMLPDF296-150F-0230 What are the insignia application requirements?
HTMLPDF296-150F-0250How do I replace lost or damaged insignia?
DESIGN PLAN
HTMLPDF296-150F-0300 When is design plan approval required?
HTMLPDF296-150F-0310 Who can approve design plans?
DESIGN-PLAN APPROVAL BY THE DEPARTMENT
HTMLPDF296-150F-0320 What must I provide with my request for design-plan approval by the department?
HTMLPDF296-150F-0325What are the requirements for temporary built structures?
HTMLPDF296-150F-0340 What must an engineering analysis for design plans include?
HTMLPDF296-150F-0350 What must the test procedures and results for design plans include?
HTMLPDF296-150F-0380What happens if you approve my design plan?
HTMLPDF296-150F-0390 If my design plan is not approved, how much time do I have to submit a corrected design plan?
HTMLPDF296-150F-0400 What happens after my design plan is approved?
HTMLPDF296-150F-0410 When does my design plan expire?
HTMLPDF296-150F-0415Who approves addendums to design plans approved by the department?
DESIGN-PLAN APPROVAL BY A LICENSED PROFESSIONAL OR FIRM
HTMLPDF296-150F-0420 Who can be authorized to approve design plans?
HTMLPDF296-150F-0430 What information must a professional or firm provide to be authorized to approve design plans?
HTMLPDF296-150F-0440 How will I know whether I am authorized to approve design plans?
HTMLPDF296-150F-0450 How long is a licensed professional or firms authorization effective?
HTMLPDF296-150F-0460 What information must a manufacturer send to the department when a professional or firm does the design plan approval?
HTMLPDF296-150F-0470 What happens after we receive the professional or firm approved design plan and information?
HTMLPDF296-150F-0480 Do you have a list of professionals or firms that are authorized to approve design plans?
HTMLPDF296-150F-0490Who approves addendums to design plans approved by a professional or firm?
HTMLPDF296-150F-0495Contractor deposit accounts.
INSPECTIONS PRIOR TO ISSUANCE OF AN INSIGNIA
HTMLPDF296-150F-0500 When is an inspection required?
HTMLPDF296-150F-0510 How do I request an inspection?
HTMLPDF296-150F-0520 What happens if my factory-built house or commercial structure passes inspection?
HTMLPDF296-150F-0530 Am I charged if I request an inspection but I am not prepared?
HTMLPDF296-150F-0540 Who inspects factory-built housing and commercial structures for installation at the building site?
HTMLPDF296-150F-0550 Do you notify the local enforcement agency after your final inspection of factory-built structures at a manufacturing location?
USED FACTORY-BUILT STRUCTURES WITHOUT AN INSIGNIA
HTMLPDF296-150F-0580 Must I obtain an insignia for used factory-built structures?
HTMLPDF296-150F-0590 How do I obtain insignia for used factory-built structures?
CODES FOR FACTORY-BUILT HOUSING, COMMERCIAL STRUCTURES, AND COMPONENTS
HTMLPDF296-150F-0600 What manufacturing codes apply to factory-built housing and commercial structures?
HTMLPDF296-150F-0605May the required toilet facilities be located in an adjacent building?
HTMLPDF296-150F-0610Do you require the exit doors to be one-half the diagonal distance apart if each area served has its own exit door?
HTMLPDF296-150F-0620Does the department require a water system expansion tank be installed?
HTMLPDF296-150F-0625Are there any special requirements for portable school classrooms?
HTMLPDF296-150F-0630When HVAC equipment is supplied with more than one CFM rating, which rating do I use?
MANUFACTURER'S NOTICE TO THE DEPARTMENT
HTMLPDF296-150F-0700 Must manufacturers of factory-built housing and commercial structures notify you if they manufacture at more than one location?
HTMLPDF296-150F-0710 Must manufacturers of factory-built housing and commercial structures notify you of a change in business name or address?
HTMLPDF296-150F-0720 Must manufacturers of factory-built housing and commercial structures notify you of a change in business ownership?
FACTORY-BUILT HOUSING AND COMMERCIAL STRUCTURE FEES
HTMLPDF296-150F-3000 Factory-built housing and commercial structure fees.
DISPOSITION OF SECTIONS FORMERLY CODIFIED IN THIS TITLE
296-150F-0615May the electrical disconnect required for mechanical equipment be inside of or mounted on the equipment? [Statutory Authority: RCW 43.22.340 and 43.22.480. WSR 99-13-010, ยง 296-150F-0615, filed 6/4/99, effective 7/5/99.] Repealed by WSR 05-01-102, filed 12/14/04, effective 2/1/05. Statutory Authority: Chapter 43.22 RCW and 2003 c 291.