SUBMISSION OF PLANS AND REPORTS FOR CONSTRUCTION OF WASTEWATER FACILITIES
WAC Sections
HTMLPDF | 173-240-010 | Purpose and scope. |
HTMLPDF | 173-240-020 | Definitions. |
DOMESTIC WASTEWATER FACILITIES | ||
HTMLPDF | 173-240-030 | Submission of plans and reports. |
HTMLPDF | 173-240-035 | Restrictions—Subsurface disposal systems. |
HTMLPDF | 173-240-040 | Review standards. |
HTMLPDF | 173-240-050 | General sewer plan. |
HTMLPDF | 173-240-060 | Engineering report. |
HTMLPDF | 173-240-070 | Plans and specifications. |
HTMLPDF | 173-240-075 | Construction quality assurance plan. |
HTMLPDF | 173-240-080 | Operation and maintenance manual. |
HTMLPDF | 173-240-090 | Declaration of construction completion. |
HTMLPDF | 173-240-095 | Form—Declaration of construction of water pollution control facilities. |
HTMLPDF | 173-240-100 | Requirement for certified operator. |
HTMLPDF | 173-240-104 | Ownership and operation and maintenance. |
INDUSTRIAL WASTEWATER FACILITIES | ||
HTMLPDF | 173-240-110 | Submission of plans and reports. |
HTMLPDF | 173-240-120 | Review standards. |
HTMLPDF | 173-240-130 | Engineering report. |
HTMLPDF | 173-240-140 | Plans and specifications. |
HTMLPDF | 173-240-150 | Operation and maintenance manual. |
DOMESTIC AND INDUSTRIAL WASTEWATER FACILITIES | ||
HTMLPDF | 173-240-160 | Requirement for professional engineer. |
HTMLPDF | 173-240-170 | Right of inspection. |
HTMLPDF | 173-240-180 | Approval of construction changes. |
DISPOSITION OF SECTIONS FORMERLY CODIFIED IN THIS TITLE
173-240-105 | Form—Certificate of construction of water pollution control facilities. [Statutory Authority: RCW 90.48.110. WSR 79-02-033 (Order DE 78-10), § 173-240-105, filed 1/23/79. Formerly chapter 372-20 WAC.] Repealed by WSR 83-23-063 (Order DE 83-30), filed 11/16/83. Statutory Authority: Chapters 43.21A and 90.48 RCW. |